Vernal Pool Hydrology Study

Summary

SCH Number
2009108219
Public Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Sacramento
Document Title
Vernal Pool Hydrology Study
Document Type
NOE - Notice of Exemption
Received
Posted
10/23/2009
Document Description
Project involves installation of piezometers (slotted PVC pipes) within each of 15 to 20 vernal pools (or three to six vernal pool basins). Bore holes will for piezometers will be hand augered. The surface soil removed by trowel will be placed within the same vernal pool basin in order not to remove plant seeds and invertebrate cysts. Once drilled, dielectric soil moisture sensors will be placed at 5 elevations within the soil profile. The construction footprint will not extend past about 18 inches on either side of the augered holes. The sensors will be removed after two wet seasons.

Contact Information

Name
Virginia Moran
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency

Location

Counties
Yuba

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 6 Sec 15306
Reasons for Exemption
Exempts Information Collection: Class 6 consists of basic data collection, research, experimental management, and resource evaluation activities which do not result in a serious or major disturbance to an environmental resource. These may be strictly for information gathering purposes, or as part of a study leading to an action which a public agency has not yet approved, adopted, or funded.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print