1250 Edgewood Road Project

3 Documents in Project

Summary

SCH Number
2009102101
Lead Agency
City of Redwood City
Document Title
1250 Edgewood Road Project
Document Type
NOD - Notice of Determination
Received
Posted
1/14/2016
Present Land Use
R-1/S-91/DR (Residential One Family, Palomar Park Combining and Design Review District)
Document Description
The project entails the construction of an Ultrablock gravity wall to rebuild and stabilize the failing bank of Cordilleras Creek at 1250 Edgewood Road in Redwood City, San Mateo County. The Ultrablock gravity wall will have a minimal cut into the existing bank and will not require tieback into the bank. At the toe of the bank, logs with rootwads will be incorporated into the wall which will preserve the scour pool at the toe of the wall and will provide a floodplain bench that will be used to plant appropriate vegetation, while providing wildlife refugia adjacent to a retained outside bend pool feature. The wall will be approximately 90 ft long and will vary from six to 18 ft tall and 2.5 to 7 ft wide. An excavator and crane will be used from the top-of-the-bank to place the Ultrablocks into place block by block. CDFW is executing a lake and streambed alteration agreement no. 1600-2014-0300-R3, pursuant to section 1602 fish and game code to the project permittee, Joseph Ravella.

Contact Information

Name
Suzanne DeLeon
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Redwood City
Counties
San Mateo
Cross Streets
Edgewood Rd and Alameda De Las Pulgas
Zip
94062
Total Acres
1.29
Parcel #
058-030-140, 130, 120
State Highways
Hwy 82, 101
Railways
Caltrain, JPB
Schools
Clifford
Waterways
Cordilleras Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A