Document Description
The proposed Interim Removal Measure (IRM) planned for 2010 at the Ascon Landfill site includes removal and disposal, or if feasible, recycling of the tarry materials from two interior lagoons in the southwest zone of the Ascon site that received oil production waste during the landfill's operation. The purpose of this action is to enable assessment of the materials underneath the tarry materials in Lagoons 1 and 2. As a result of the Landfill's history of receiving asphalt, concrete and other construction debris after it stopped receiving oil production waste, it is expected there are materials of unknown size and composition in and under the lagoons. A more complete assessment of Lagoons 1 and 2 will allow for an informed remedial construction effort during the final remedy in a manner that is protective of public health and safety and the environment. The maximum volume of material to be removed is 70,000 cubic yards, inclusive of any additives needed to dry the tarry materials for transport.
Contact Information
Name
Greg Holmes
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Huntington Beach
Counties
Orange
Cross Streets
Magnolia St and Hamilton Ave
Zip
92646
Total Acres
38
Parcel #
114-150-75, -78, -79, -80
State Highways
Hwy 1, 39
Schools
Edison HS, numerous schools
Waterways
Huntington Beach Flood Control Channel, Santa Ana River
Township
6S
Range
11W
Section
13
Base
SBB&M
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No