Addendum to Pine Mountain Forest Fire Station Relocation Project Mitigated Negative Declaration
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009101004
- Lead Agency
- Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
- Document Title
- Addendum to Pine Mountain Forest Fire Station Relocation Project Mitigated Negative Declaration
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/15/2015
- Present Land Use
- undeveloped
- Document Description
- The project consists of the relocation of existing fire station facilities. The original project included a 3,134 square-foot barracks-messhall and a 1,664 square-foot apparatus buildings. The project now proposes a single 6,054 square-foot building, including barracks-messhall, apparatus, generator-storage and water treatment portions. All other elements of the project remain the same, and no substantial changes have occurred that would change the determinations in the original 2009 initial study-mitigated negative declaration.
- Contact Information
-
Chris Browder
Cal Fire
PO Box 944246
Sacramento, CA 94244-2460
Phone : (916) 653-4995
Location
- Coordinates
- 35°51'47.2"N 118°43'52.3"W
- Counties
- Tulare
- Cross Streets
- Hot Springs Rd/Old Hot Spring Rd
- Zip
- 93207
- Total Acres
- 5.0
- Parcel #
- 344-110-012
- Schools
- Hot Springs ES
- Waterways
- Speas Creek
- Township
- 24S
- Range
- 30E
- Section
- 3
- Other Location Info
- City/Nearest Community: California Hot Springs
Notice of Determination
- Approving Agency
- Department of Forestry and Fire Protection
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Cal Fire, PO Box 944246, Sacramento, CA 94244
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.