Pine Mountain Forest Fire Station
3 Documents in Project
Summary
SCH Number
2009101004
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Pine Mountain Forest Fire Station
Document Type
NOD - Notice of Determination
Received
Posted
11/12/2009
Present Land Use
undeveloped
Document Description
Cal Fire is proposing to relocate existing fire station facilities, located along Hot Springs Road west of the community of California Hot Springs, to a new site located immediately southwest of the intersection of Hot Springs Road and Old Hot Springs Road in Tulare County, California. The project includes the construction of new fire station facilities at the project site. The purpose of this project is to provide new buildings and support facilities that will meet the current building codes and have adequate space for future operations, serving southern Tulare County and the southern Sierra Nevada. The proposed project site for the relocated facilities is a parcel ~5 acres. Facilities will include a 3134 sf barracks/mess hall; a 1664 sf apparatus building with generator, transfer switch, and fuel supply; a 1000 gallon fuel vault with cover and fueling equipment; a 1000 sf vehicle wash rack with treatment and recycling equipment; a water system including a well, 10,000 gallon domestic storage tank, 40,000 gallon fire water tank, and pressure distribution system; a septic tank and leach field; all utilities; and site work including grading, paving, drainage, fencing, landscaping, sidewalks, curbs, and all appurtenances.
Contact Information
Name
Valerie Namba
Agency Name
Cal Fire
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Tulare
Cross Streets
Hot Springs Rd/Old Hot Spring Rd
Zip
93207
Total Acres
5.0
Parcel #
344-110-012
Schools
Hot Springs ES
Waterways
Speas Creek
Township
24S
Range
30E
Section
3
Other Location Info
City/Nearest Community: California Hot Springs
Notice of Determination
Approving Agency
Department of Forestry and Fire Protection
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.