Redding Minor Subdivision; 3200 21112 (TPM)

2 Documents in Project

Summary

SCH Number
2009101003
Lead Agency
San Diego County
Document Title
Redding Minor Subdivision; 3200 21112 (TPM)
Document Type
NOD - Notice of Determination
Received
Posted
11/23/2009
Document Description
The project proposes a Tentative Parcel Map to subdivide a 10.11 acre property (APN 239-360-08) into 3 residential parcels (between 2 and 4 acres in size) located at the terminus of Puebla Street at Mary Lane within the North County Metro Community Planning Area of unincorporated San Diego County. The site is zoned as A70 and is subject to the General Plan Regional Category "Current Urban Development Area" (CUDA), Land Use Designation (1) Residential. The project site is currently vacant undeveloped land and with no existing structures. Access to all 3 proposed parcels will be private driveways connecting to Puebla Street. Earthwork consists of 5,000 cy of cut and 350 cy of fill material for the 3 proposed residential pads and private driveways. Wastewater service will be provided by on-site wastewater systems (OSWS) (septic). Imported public water service will be provided by the City of Escondido. Fire protection service will also be provided by Escondido Fire Protection District (contracted by Rincon del Diablo Municipal Water District).

Contact Information

Name
Kristina Jeffers
Agency Name
San Diego County
Contact Types
Lead/Public Agency

Location

Cities
Escondido
Counties
San Diego
Cross Streets
Puebla St/Mary Ln
Zip
92025
Total Acres
10.11
Parcel #
239-360-08-00
State Highways
i_15
Schools
Classical Acad,Bear Valley MS,L.R. Green ES,San Pasqual HS

Notice of Determination

Approving Agency
San Diego County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print