Cherokee Point Elementary School Central Plant Completion
Summary
SCH Number
2009098197
Public Agency
San Diego Unified School District
Document Title
Cherokee Point Elementary School Central Plant Completion
Document Type
NOE - Notice of Exemption
Received
Posted
9/21/2009
Document Description
During project activities occuring under Proposition MM, the school's central plant was designed, but the chiller, chilled water piping, and fan coils were not installed. This leaves the school with heating, but no air conditioning. Under this Proposition S project, the completed design is to be verified and the chiller, chilled water piping, and fan coils will be installed. Project activities would occur in developed and/or previously disturbed areas. Ground disturbance would be limited to installation of a small chiller pad approximately 10' x 4' in size.
Contact Information
Name
David D. Davis
Agency Name
San Diego Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15303(e)
Reasons for Exemption
The project is located on the exisitng elementary school campus in an area where the ground disturbance has previously occurred.