Pinole-Hercules Water Pollution Control Pollution Control Plant Improvement Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-7856-110

10 Documents in Project

Summary

SCH Number
2009092024
Lead Agency
City of Pinole
Document Title
Pinole-Hercules Water Pollution Control Pollution Control Plant Improvement Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-7856-110
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2016
Present Land Use
The project site is the existing Pinole-Hercules Water Pollution Control Plant. The site is designated and zoned Public/Quasi-Public/Institutional
Document Description
The Project consists of various improvements to the Pinole-Hercules WPCP necessary to provide full secondary treatment for influent flows up to 20 million gallons per day (mgd), to discharge treated effluent up to 13.9 mgd to the Deep Water Outfall, and to limit use of the Emergency Outfall to flows in excess of 13.9 mgd. The Project will include construction of a new influent pump station/headworks facility and a new Solids Handling Facility, along with upgrades to the secondary treatment facilities , electrical facilities, and effluent pump stations. The Project generally involves site preparation, grading, excavation, backfilling, building construction, and installation of pipelines within the WPCP deed line. All proposed improvements will occur within the existing developed footprint of the WPCP site and no in-water construction activities will occur as part of the Project.

Contact Information

Name
Carina Grove
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Cities
Hercules, Pinole
Counties
Contra Costa
Cross Streets
Tennent Avenue and Railroad Avenue
Zip
94564
Total Acres
4.5
Parcel #
401-010-010
State Highways
SR 4 & I-80
Railways
Union Pacific
Airports
No
Schools
St. Joseph School, et. al.
Waterways
San Pablo Bay; Pinole, Ohlone, Refugio, & Rodeo Creek
Township
2N
Range
4W
Section
15
Base
MDB&M
Other Location Info
City/Nearest Community: Rodeo

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print