Adelanto Towne Center Project

3 Documents in Project

Summary

SCH Number
2009091129
Lead Agency
City of Adelanto
Document Title
Adelanto Towne Center Project
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2010
Document Description
The proposed project consists of a regional shopping center with approximately 280,000sf of retail building space and associated site improvements on an approximately 35.31-acre site. The shopping center would include a Target Department Store (approximately 138,478sf) and other major retailers ranging from 7,000 to 25,000sf each. In addition, there would be three shops, with two proposed to be food establishments, and one proposed to be a retail establishment. These shops range from 7,000 to 10,500sf. The proposed project would also include the development of six free-standing commercial pads ranging from 3,250 to 4,500sf. The conceptual site layout arranges the major attached retail buildings parallel to US-395, with the retail pads are scattered around the remaining perimeter of the site mainly closer to US-395. Site access is from with two points off US-395 and two access points off Mojave Drive.

Contact Information

Name
Linda Blackbern
Agency Name
City of Adelanto
Contact Types
Lead/Public Agency

Location

Cities
Adelanto
Counties
San Bernardino
Cross Streets
U.S. Hwy 395 and Mojave Drive
Zip
92301
Total Acres
35.31
Parcel #
3135-201-01-0000
State Highways
US 395, SR-18
Railways
No
Airports
No
Schools
Bradach and Desert Trails ES, Silverado HS
Waterways
No
Township
5N
Range
5W
Section
16
Base
SBB&M

Notice of Determination

Approving Agency
City of Adelanto
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print