California High-Speed Train Project: Merced to Fresno Permitting Phase 1 and Fresno to Bakersfield Section, CP1C Permitting Phase 1 (Amendment No. 3 to Master S
73 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009091126
- Lead Agency
- High Speed Rail Authority, California (California High Speed Rail Authority)
- Document Title
- California High-Speed Train Project: Merced to Fresno Permitting Phase 1 and Fresno to Bakersfield Section, CP1C Permitting Phase 1 (Amendment No. 3 to Master S
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/15/2015
- Present Land Use
- Various (urban[industrial, commercial and residential], rural residential, agricultural, and undeveloped)
- Document Description
- CDFW has executed Amendment No. 3 to Master Streambed Alteration Agreement no. 1600-2013-0060-R4 (Agreement), to the Permittee, California High-Speed Rail Authority. The project approved by CDFW consists of the agreement identified above, which addresses construction and operation of the Merced to Fresno segment of the CA High Speed Train (HST), as approved by the lead agency, affecting or generally related to fish and wildlife resources subject to the regulatory authority of CDFW, including natural resources subject to fish and game code section 1600 et seq. The agreement authorizes certain activities contemplated in section 1602 of the fish and game code that could cause substantial adverse effects to fish and wildlife resources. The agreement in this respect will facilitate construction and operation of the project. The project as originally permitted will impact fish and wildlife habitat subject to the notification requirement in section 1602 of the fish and game code within and /or adjacent to the Fresno River, Main Canal, Cottonwood Agreement involves increasing the areas of impacts at the Dry Creek Canal, and Chowchilla River. The amendment no. 3 to the agreement involves increasing the areas of impacts to the Dry Creek construction location, modifying the level of design required with Subnotification submittal, and specifying info needed for certain future agreement amendments.
- Contact Information
-
Linda Connolly
CDFW Central Region
124 East Shaw Avenue
Fresno, CA 93710
Phone : 559-243-4014 ext. 242
Location
- Cities
- Fresno Madera
- Counties
- Fresno Madera
- Zip
- various
- Total Acres
- ~114
- Parcel #
- various
- State Highways
- Hwy 43, others
- Railways
- UPRR, BNSF, SJVRR
- Airports
- Several Local Airports
- Schools
- Multiple
- Waterways
- Kings, Tule, & Kern Rivers; Cross & Poso Creeks
- Township
- variou
- Range
- variou
- Section
- variou
- Base
- various
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- CDFW 1234 East Shaw Avenue, Fresno, CA 93710
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.