California High-Speed Train Project Fresno to Bakersfield Section Project - Permit 18956-3

73 Documents in Project

Summary

SCH Number
2009091126
Lead Agency
High Speed Rail Authority, California (California High Speed Rail Authority)
Document Title
California High-Speed Train Project Fresno to Bakersfield Section Project - Permit 18956-3
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2020
Project Applicant
California High Speed Rail Authority

Document Description
Approval of Permit No. 18956-3, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To include the construction of a temporary steel trestle on the downstream side of the permanent bridge consisting of 35-foot spans on 36-inch steel pipe piles driven into the riverbed. The temporary trestle will be in service for approximately two years and all materials will be removed when the trestle is decommissioned.

Contact Information
James Herota
Central Valley Flood Protection Board
3310 El Camino Ave., Suite 170
Sacramento, CA 95821

Phone : (916) 574-0651
james.herota@CVFlood.ca.gov

Location

Cities
Kingsburg
Counties
Fresno Kings
Cross Streets
Kings River approximately 300 feet south of 8 1/2 Avenue, Kings County
Waterways
Kings River
Other Information
Approval of Permit No. 18956-3, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To include the construction of a temporary steel trestle on the downstream side of the permanent bridge consisting of 35-foot spans on 36-inch steel pipe piles driven into the riverbed. The temporary trestle will be in service for approximately two years and all materials will be removed when the trestle is decommissioned

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Central Valley Flood Protection Board 3310 El Camino Avenue, Suite 170 Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
18956-3_NOD_signed_ref   PDF 495 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.