California High Speed Train - Fresno to Bakersfield Permitting Packages 1.a and 1.b
122 Documents in Project
Summary
SCH Number
2009091126
Lead Agency
California High Speed Rail Authority
Document Title
California High Speed Train - Fresno to Bakersfield Permitting Packages 1.a and 1.b
Document Type
NOD - Notice of Determination
Received
Posted
10/2/2018
Present Land Use
Various (urban[industrial, commercial and residential], rural residential, agricultural, and undeveloped)
Document Description
This is the 2nd amendment to the orginal Order. The Project will construct approximately 87 miles of the overall HSt project. The Project includes the HSt tracks, structures, stations, traction power substations, maintenance facilities, and train vehicles. The HSt would use four different track types: at-grade, elevated by either a structure or on a retained fill platform, and below-grade tracks in a retained cut. The type of bridges that might be built includes full channel spans, large box culverts, or for some larger river crossings, piers within the ordinary high-water channel. This amendment provides for ecological restoration and enhancement work at approved mitigation sites.
Contact Information
Name
Cliff Harvey
Agency Name
Water Resources Control Board, DWQ
Contact Types
Lead/Public Agency
Phone
Location
Cities
Bakersfield, Fresno, Hanford, Wasco
Counties
Kings
Zip
various
Total Acres
~114
Parcel #
various
State Highways
Hwy 43, others
Railways
UPRR, BNSF, SJVRR
Airports
Several Local Airports
Schools
Multiple
Waterways
Kings, Tule, & Kern Rivers; Cross & Poso Creeks
Township
variou
Range
variou
Section
variou
Base
various
Notice of Determination
Approving Agency
CA Public Utilities Commission
Approving Agency Role
Responsible Agency
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.