California High-Speed Train Project Fresno to Bakersfield Section Project

120 Documents in Project

Summary

SCH Number
2009091126
Lead Agency
California High Speed Rail Authority
Document Title
California High-Speed Train Project Fresno to Bakersfield Section Project
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2018
Present Land Use
Various (urban[industrial, commercial and residential], rural residential, agricultural, and undeveloped)
Document Description
Approval of Permit No. 18956-3, under CA Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To construct two sets of bridge tracks over the Kings River Complex. The bridge will be 445 feet and 5 1/8 inches long from the centerline of abutments on both sides. The structures will be supported by 3 bent 10 feet in diameter at the base. The spacing between bents are 110 feet long. The abutments will transition into a natural embankment.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield, Fresno, Hanford, Wasco
Counties
Fresno
Zip
various
Total Acres
~114
Parcel #
various
State Highways
Hwy 43, others
Railways
UPRR, BNSF, SJVRR
Airports
Several Local Airports
Schools
Multiple
Waterways
Kings, Tule, & Kern Rivers; Cross & Poso Creeks
Township
variou
Range
variou
Section
variou
Base
various

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print