California High-Speed Train Project Fresno to Bakersfield Section Project
77 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009091126
- Lead Agency
- California High Speed Rail Authority
- Document Title
- California High-Speed Train Project Fresno to Bakersfield Section Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/31/2018
- Present Land Use
- Various (urban[industrial, commercial and residential], rural residential, agricultural, and undeveloped)
- Document Description
- Approval of Permit No. 18956-3, under CA Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To construct two sets of bridge tracks over the Kings River Complex. The bridge will be 445 feet and 5 1/8 inches long from the centerline of abutments on both sides. The structures will be supported by 3 bent 10 feet in diameter at the base. The spacing between bents are 110 feet long. The abutments will transition into a natural embankment.
- Contact Information
-
James Herota
Central Valley Flood Protection Board
Lead/Public Agency
1234 E. Shaw Ave.,
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Cities
- Bakersfield Fresno Hanford Wasco
- Counties
- Fresno
- Zip
- various
- Total Acres
- ~114
- Parcel #
- various
- State Highways
- Hwy 43, others
- Railways
- UPRR, BNSF, SJVRR
- Airports
- Several Local Airports
- Schools
- Multiple
- Waterways
- Kings, Tule, & Kern Rivers; Cross & Poso Creeks
- Township
- variou
- Range
- variou
- Section
- variou
- Base
- various
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave., Suite 170, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.