Fresno to Bakersfield High-Speed Train Project Environmental Report/Environmental Impact Statement

73 Documents in Project

Summary

SCH Number
2009091126
Lead Agency
High Speed Rail Authority, California (California High Speed Rail Authority)
Document Title
Fresno to Bakersfield High-Speed Train Project Environmental Report/Environmental Impact Statement
Document Type
NOP - Notice of Preparation
Received

Document Description
Reference SCH#2009021107 The purpose of the proposed HST System is to provide a new mode of high-speed intercity travel that would link major metropolitan areas of the state; interface with international airports, mass transit, and highways; and provide added capacity to meet increases in intercity travel demand in California in a manner sensitive to and protective of California's unique natural resources. The need for a HST System is directly realted to the expected growth in population, and increases in intercity travel demand, there will be an increase in travel delays arising from the growing congestion on California's highways and at airports. In addition, there will be negative effects on the economy, quality of life, and air quality in and around California's metropolitan areas from an increasingly congested transportation system, commercial airports, and conventional passenger rail serving the intercity travel market are currently operating at or near capacity, and will require large public investment for maintenance and currently operating at or near capacity, and will require large public investments for maintenance and expansion to meet existing demand and future growth. The proposed HST System is designed to address some of the social, economic, and environmental problems associated with transportation congestion in California.

Contact Information
Carrie Bowen
California High Speed Rail Authority
925 L Street , Suite 1425
Sacramento, CA 95814

Phone : (559) 221-2636

Location

Cities
Bakersfield Fresno Hanford Wasco
Counties
Fresno Kern Kings Tulare

Notice of Completion

Review Period Start
Review Period End
Development Type
Transportation:Rail (High Speed Rail)
Reviewing Agencies
Air Resources Board, Transportation Projects California Department of Conservation California Department of Fish and Wildlife, Central Region 4 California Department of Parks and Recreation California Department of Public Health California Department of Transportation, District 6 California Highway Patrol California Native American Heritage Commission California Regional Water Quality Control Board, Central Valley Fresno Region 5 Central Valley Flood Protection Board Department of Toxic Substances Control Department of Water Resources Office of Historic Preservation Resources Agency California State Lands Commission Other - Public Comments California Public Utilities Commission

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print