Caltrans-D6 Issuance of an Encroachment Permit for work of the CHSR Project-Install Utility Pole
97 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009091125
- Lead Agency
- California High Speed Rail Authority
- Document Title
- Caltrans-D6 Issuance of an Encroachment Permit for work of the CHSR Project-Install Utility Pole
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/15/2020
- Document Description
- New utility pole will be placed within Caltrans ROW, within the north east of quadrant SR36/Kent Ave intersection, 120' from the Edge-of-Traveled-Way (ETW). The work will be performed at two locations (Site 1 and 2) as follows: SITE 1: Caltrans Postmile SR-42 KIN 11.398 1.) Install one new power pole. 2.) Install 315 feet of conductor crossing SR-43 and Kent Ave.
- Contact Information
-
Brian P. Kelly
California High Speed Rail
Lead/Public Agency
770 L Street, Suite 620
Sacramento , CA 95814
Phone : (916) 324-1541
-
California Department of Transportation-District 6 (Caltrans)
Project Applicant
Location
- Counties
- Kings
- Cross Streets
- SR-46 and Kent Avenue
- State Highways
- SR-46
Notice of Determination
- Approving Agency
- Caltrans, District 6
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- www.cahighspeedrail.ca.gov
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2009091125_Caltrans D6 Install Utility Poles PDF 134 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.