Tree Removal along SR-137 - HSR Underpass over SR-137
97 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009091125
- Lead Agency
- California High Speed Rail Authority
- Document Title
- Tree Removal along SR-137 - HSR Underpass over SR-137
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/25/2019
- Present Land Use
- Various (urban[industrial, commercial, and residential, rural residential, agricultiral, and undeveloped)
- Document Description
- Removal of the existing Eucalyptus trees long SR-137 on the South shoulder to ground level. Stumps to be removed at a later date, in tandem with future roadway excavation. Daytime closure of SR-137, to facilitate branch trimming and removal. Traffic handling to be conducting during the work.
- Contact Information
-
Trais Norris
Caltrans
Lead/Public Agency
855 M Street, Suite 200
Fresno, CA 93721
Phone : (559) 445-6447
Location
- Counties
- Kings
- Zip
- various
- State Highways
- Hwy 59,140,99,152,145,180,41
- Railways
- Union Pacific, BNSF
- Airports
- Castle, Merced, Madera
- Schools
- Various
- Waterways
- San Joaquin River, various smaller waterways
- Township
- var
- Range
- var
- Section
- var
- Other Location Info
- Whitley Ave (SR 137)
Notice of Determination
- Approving Agency
- Caltrans
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- www.cahighspeedrail.ca.gov
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.