Caltrans D6 Issuance of an Encroachment Permit for CHSR Project - Nevada Ave at SR43 Frontier Utilities

131 Documents in Project

Summary

SCH Number
2009091125
Lead Agency
California High Speed Rail Authority
Document Title
Caltrans D6 Issuance of an Encroachment Permit for CHSR Project - Nevada Ave at SR43 Frontier Utilities
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2022
Document Description
Site 1: Caltrans Postmile SR43 KIN 5.153/5/097 Open Trench(appx. 270') to install one 4" PTS77 conduit with one 1" and two 1.25" inter ducts. Install 4.5'x8.5'x6.5' manhole to intercept cable and fiber. Replace existing pedestal with a 2'x3 flatwall pull box and ground bed. Site 2: Caltrans Postmile SR 43 KIN 5.093 Open Trench (Approx. 40') to install three 4" PTS77 conduit within concrete encasement duct bank. Intercept cable and fiber with manhole. Site 3: Caltrans postmile SR43 KIN 5.097 5.048 Open trench (approx. 260') to install two 4" PTS77 conduit. Remove existing Frontier handhole. Install new anchor and downguy to existing pole.

Contact Information

Name
Haesun Lim
Agency Name
California Department of Transportation
Job Title
Senior Environmental Planner
Contact Types
Responsible Agency

Location

Counties
Kings
Regions
Unincorporated
Cross Streets
SR43 and Nevada Ave.

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.