State Route 99 Realignment Project - HSRA Merced to Fresno Section
98 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009091125
- Lead Agency
- California High Speed Rail Authority
- Document Title
- State Route 99 Realignment Project - HSRA Merced to Fresno Section
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/14/2014
- Present Land Use
- Various (urban[industrial, commercial, and residential, rural residential, agricultiral, and undeveloped)
- Document Description
- Project proposes to realign the section of State Route 99 from Clinton Avenue to Ashlan Avenue 80 to 100 feet to the west (postmiles 23.5/26.6), which would provide adequate space for the proposed High Speed Train facilities in between the Union Pacific Rail Road and Caltrans right of way.
- Contact Information
-
Kirsten Helton
California Department of Transportation
Lead/Public Agency
855 M Street, Suite 200
Fresno, CA 93721
Phone : (559) 445-6461
Location
- Cities
- Fresno Madera
- Counties
- Madera
- Zip
- various
- State Highways
- Hwy 59,140,99,152,145,180,41
- Railways
- Union Pacific, BNSF
- Airports
- Castle, Merced, Madera
- Schools
- Various
- Waterways
- San Joaquin River, various smaller waterways
- Township
- var
- Range
- var
- Section
- var
Notice of Determination
- Approving Agency
- Caltrans
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Request a CD-ROM, or locate a library that has a hard copy. www.cahighspeedrail.ca.gov
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.