Ridge Fontana ONE Project
14 Documents in Project
Summary
SCH Number
2009091089
Lead Agency
City of Fontana
Document Title
Ridge Fontana ONE Project
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2016
Present Land Use
The proposed project area is 3,111 acres in size and is subject to various zoning and General Plan designations. However, the majority of the project site is designated General Industrial and Light Industrial by the General Plan. The majority of the site is zoned Community Commercial, Light Industrial, General Industrial, and Public Facilities.
Document Description
Note: Addendum
The proposed project is anticipated to consists of the development of an ~319,000 sf high-cube warehouse/distribution building, located in the western area of the site. The building is planned to consist of up to 10,000 sf of office space that can be located in either the northeast or the southwest corner of the building in varying square footages, totaling 10,000 sf, and a loading dock would be constructed along the east side of the building. The building would be surrounded by asphaltic concrete pavements for parking and drive lanes and Portland cement concrete pavements for the loading dock areas.
Contact Information
Name
Rina Leung
Agency Name
City of Fontana
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fontana
Counties
San Bernardino
Cross Streets
Numerous
Zip
92335
Total Acres
3,111
Parcel #
Numerous
State Highways
I-10, I-15, SR 60
Railways
Yes
Airports
Ontario
Schools
Yes
Township
1S
Range
6W
Section
Multi
Base
SBB&M
Notice of Determination
Approving Agency
City of Fontana
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.