Valley County Water District Arrow Reservoirs

2 Documents in Project

Summary

SCH Number
2009091082
Lead Agency
Valley County Water District
Document Title
Valley County Water District Arrow Reservoirs
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2010
Document Description
The proposed Arrow Reservoirs Project ("Project") would construct two 3.0 million gallon (MG) above ground steel water reservoirs to achieve the required 6.0-MG storage in the Upper Baldwin Park Pressure Zone. The Project is located in the City of Irwindale on property immediately north of the Joanbridge Plant. The proposed project consists of: (1) two 3.0 million gallon (MG) above ground steel reservoirs, surrounding tank pad and related drainage features, which would involve shallow excavation; (2) underground piping connecting the new reservoirs to the existing Joanbridge Plant immediately to the south across Live Oak Avenue for distribution; (3) two paved access driveways; and (4) enclosing the project site with fencing and installation of other security features. Off-site improvements. Limited to the installation of underground pipelines, would also be constructed within the City of Baldwin Park.

Contact Information

Name
Brian Dickinson
Agency Name
Valley County Water District
Contact Types
Lead/Public Agency

Location

Cities
Irwindale
Counties
Los Angeles
Cross Streets
Arrow Hwy and Live Oak Ave
Zip
91706
Total Acres
1.8
Parcel #
8535-001-911
State Highways
I-605
Schools
Margaret Health ES
Waterways
Santa Fe Dam Flood Control Basin, San Gabriel River

Notice of Determination

Approving Agency
Valley County Water District "VCWD"
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.