San Elijo Joint Powers Authority Recycled Water Expansion Improvement Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009091078
- Lead Agency
- San Elijo Joint Powers Authority
- Document Title
- San Elijo Joint Powers Authority Recycled Water Expansion Improvement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/14/2011
- Present Land Use
- PLU: San Elijo Water Reclamation Facility Public Utility
- Document Description
- The project proposes to create an additonal 600 ac ft (AF) per year of new water supply; improve water quality, reliability and operational efficiency of the recycled water produced at the facility; add treatment to allow the facility to accept and treat urban runoff; and create new opportunities to protect coastal water quality. Project improvements would include (1) constructing 0.5 MGD of advanced wastewater treatment, (2) converting an existing tank to store recycled water, (3) constructing a new recycled water distribution pumping station, (4) convert existing tanks to store treated wastewater from the Escondido Land Outfall for emergency outfall pressure equalization, and (5) construct new distribution pipelines to serve additional customers. Items 4 through 4 will be activities performed at the San Elijo Water Reclamation Facility. Item 5 would provide offsite recycled water extension pipelines along Encinitas Boulevard (from 3rd Street to Saxony Road, ~0.61 mile in length) and Paseo de Las Flores (from Quali Gardens Drive to Lynwood Drive, ~0.56 mile in length).
- Contact Information
-
Michael Thornton
San Elijo Joint Powers Authority
2695 Manchester Avenue
Cardiff, CA 92007
Phone : (760) 753-6203
Location
- Cities
- Encinitas
- Counties
- San Diego
- Cross Streets
- multiple
- Zip
- 92024
- State Highways
- Hwy 101
- Waterways
- San Elijp Lagoon
Notice of Determination
- Approving Agency
- San Eliio Joint Powers Authority
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- San Eliio Joint Powers Authority, 2695 Manchester Avenue, Cardiff, CA 92207
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.