Echo Park Lake Rehabilitation Project

4 Documents in Project

Summary

SCH Number
2009091036
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Echo Park Lake Rehabilitation Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project would be consistent with the Regional Water Quality Control Board's intent to restore the existing and potential beneficial water quality uses in the Lake. The project would include a new Lake liner, new wetland areas, a Lake outlet, a partition berm in the Lake to comply with California Division of Safety of Dams requirements, a recirculation pump and piping system to circulate the Lake water, modification of existing storm drains inletting to the Lake to divert low flow urban runoff into the Lake, aquatic emergent plants at various points along the Lake edge, various improvements to the Lake's edge and areas adjacent to the Lake's edge, replacement of a majority of the existing aspalt pathway around the Lake perimeter with pervious meterials, hydrodynamic separators, rain gardens and grassy swales, and an upgrade of the irrigation system.

Contact Information
Maria Martin
City of Los Angeles, DPW BOE
1149 S. Broadway, Suite 600
Los Angeles, CA 90015

(213) 485-5753

Location

Coordinates
34°4'21.8"N 118°15'32.5"W
Cities
Los Angeles, City of Los Angeles
Counties
Los Angeles
Cross Streets
ECHO Park Ave. & Bellevue Ave.
Zip
90026
Total Acres
24
Parcel #
5404-015-900
State Highways
US 101, SR 110, I-5, SR 2
Railways
UPRR
Schools
Logan Street ES
Waterways
Echo Park Lake and Silver Lake
Other Location Info
City/Nearest Community: Echo Park, Silver Lake

Notice of Determination

Approving Agency
Los Angeles City Council
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Los Angeles Office of the City Clerk 200 N. Spring St. Los Angeles, CA 90012

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search