Raw Water Pump Station Upgrades

2 Documents in Project

Summary

SCH Number
2009091009
Lead Agency
Sweetwater Authority
Document Title
Raw Water Pump Station Upgrades
Document Type
NOD - Notice of Determination
Received
Posted
11/2/2009
Present Land Use
Transportation, Communication and Utilities; Open Space Park or Reserve
Document Description
1) Installation of slope protection netting on the rocky slope adjacent to the RWPS access road for protection of the RWPS and water mains along the road. 2) Provision of emergency power in the event of a regional power outage through construction of generator connection pad directly upslope of the RWPS and a power connection between the RWPS and the pad. 3) Upgrade of various components of the RWPS within its current footprint. The project's impact to 0.53 acre of coastal sage scrub will be mitigated though permanent preservation of 0.712 acres of CSS in an agency-approved mitigation area and processed through a Habitat Loss Permit (HLP).

Contact Information

Name
Troy Murphree
Agency Name
Sweetwater Authority
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
100 Lakeview Ave, Spring Valley
Zip
91917
Total Acres
2
Parcel #
585-161-01
State Highways
125
Railways
No
Airports
No
Schools
6
Waterways
Sweetwater River
Township
17S
Range
1W
Other Location Info
City/Nearest Community: Spring Valley

Notice of Determination

Approving Agency
Sweetwater Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print