Operation of the Marygold Municipal Water Company Perchlorate IX Treatment Plant
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009089013
- Lead Agency
- San Bernardino County
- Document Title
- Operation of the Marygold Municipal Water Company Perchlorate IX Treatment Plant
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/3/2016
- Document Description
- The State Water Resources Control Board (SWRCB), as the responsible agency, will be issuing a water supply permit. The Marygold Mutual Water Company existing water treatment system includes a 1,000 gallon per minute and a 2,000 gallon per minute well, with a chlorine injector, two 2-million gallon storage reservoirs, 2 low lift pumps to fill tanks, and three 1000 gallon per minute booster pumps each with 50 HP motors to distribute the water to the system. The Marygold Mutual Water Company is adding two 10-micron cartridge filters for particle filtration and two ion exchange vessels containing resin beads to remove perchlorate (via an ion exchange process). The cartridge filters will be replaced over time, and after many years, the resin beads are removed and regenerated offsite and fresh beads are inserted. These components will be installed in the treatment process before the chlorine is added and are the fifth phase of an overall project that is outlined in the lead agency's environmental document. The Project will provide for the operation and maintenance of these new treatment components and the overall treatment system.
- Contact Information
-
Sean McCarthy
SWRCB
Lead/Public Agency
464 W. 4th St, Room 437
San Bernardino, CA 92401
Phone : (909) 383-4328
Location
- Counties
- San Bernardino
- Other Location Info
- Bloomington
Notice of Determination
- Approving Agency
- SWRCB
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 464 W. 4th Street, Room 437, San Bernardino, CA 92401
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.