MacArthur Boulevard/SR-55 interchange On-Ramp Widening Project

Summary

SCH Number
2009088308
Public Agency
City of Santa Ana
Document Title
MacArthur Boulevard/SR-55 interchange On-Ramp Widening Project
Document Type
NOE - Notice of Exemption
Received
Posted
8/28/2009
Document Description
The City of Santa Ana's SR-55/MacArthur Boulevard Interchane Ramp Widening Project (EA 0H2900) will implement a series of interchange improvements. Tha project will be developed within the existing Caltrans and City right of way (ROW). The following improvements are proposed: * Widen eastbound MacArthur Boulevard from three lanes to four lanes between Hutton Centre Drive and the SR-55 northbound loop on-ramp. * Widen the southbound direct on-ramp from one mixed-flow lane to two mixed-flow lands. * Widen the northbound loop on ramp from one mixed-flow lane to two mixed-flow lanes.

Contact Information

Name
Kenny Nguyen
Agency Name
City of Santa Ana
Contact Types
Lead/Public Agency

Location

Cities
Santa Ana
Counties
Orange

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301(c)
Reasons for Exemption
It can be seen with certainty that there is no possibility that the activity may have a significant effect on the environment.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print