City of Folsom EID Intertie Project

2 Documents in Project

Summary

SCH Number
2009082015
Lead Agency
City of Folsom
Document Title
City of Folsom EID Intertie Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
City of Folsom, El Dorado Irrigation District, and the El Dorado County DOT Public Easement Lands and Rights-of-Way
Document Description
A Pressure Reducing /Flow Sustaining (PRFS) Station and a Booster Pump Station would be constructed to meet the City of Folsom and El Dorado Irrigation District's (EID) needs to transfer water to and from either system for emergency purposes. the PRFS Station would be located within the City of Folsom, and the Booster Pump Station would be located in El Dorado County. The City of Folsom Utilities Departme would manage operations of the PRFS Station, and EID would manage operations of the Booster Pump Station. A Memorandum of Understanding (MOU) is being developed between the City and EID for coordination of emergency use of the proposed water main interconnection.

Contact Information

Name
Kyle Ericson
Agency Name
City of Folsom Utilities Department
Contact Types
Lead/Public Agency

Location

Cities
Folsom
Counties
El Dorado, Sacramento
Cross Streets
Alexandra Dr, Sophia Parkway, Muirkirk Court
Zip
95630
Total Acres
1/4
State Highways
Hwy 50
Schools
Lakeview ES
Waterways
Folsom Lake
Township
10N
Range
8E
Section
28
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (water main pipeline intertie)
Local Actions
pipeline intertie
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Transportation, Vegetation, Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print