Vitale Major Subdivision
2 Documents in Project
Summary
SCH Number
2009082005
Lead Agency
Humboldt County
Document Title
Vitale Major Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2009
Document Description
A Final Map Subdivision of a 3.7 acre parcel into nine residential lots ranging in size from 0.25 to 0.59 acres. The subdivision will be served by community water and sewer, and accessed from Purdue Drive. The subdivision places the existing residences onto Lot 7. The project involves tree removal, construction of drainage facilities, and on- and off-site improvements. The project requires exception to road right-of-way width standards and lot frontage requirements, and a reduction in the wetland setback to allow a 50 ft wetland buffer. The project involves restoration of the wetlands to natural conditions by re-contouring, removal of drainage pipes and vegetation with native Sitka spruce as specified by the Wetland Delineation. The property is within the Coastal Zone and requires approval of a Coastal Development Permit.
Contact Information
Name
Anita Punla
Agency Name
Humboldt County Planning Division
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Eureka
Counties
Humboldt
Cross Streets
Purdue and Stanford
Zip
95503
Total Acres
3.7
Parcel #
306-381-06
State Highways
Hwy 101
Waterways
unnamed Creek
Township
4N
Range
1W
Section
17
Base
HB&M
Other Location Info
Coty/Nearest Community: Humboldt Hill
Notice of Determination
Approving Agency
Humboldt County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.