Highway 395 Widening Phase 1 (0F631) (Lake or Streambed Alteration Agreement No. 1600-2016-0106-R6)

4 Documents in Project

Summary

SCH Number
2009081105
Lead Agency
California Department of Transportation, District 8
Document Title
Highway 395 Widening Phase 1 (0F631) (Lake or Streambed Alteration Agreement No. 1600-2016-0106-R6)
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2018
Present Land Use
Rural Living and Resource Conservation Land
Document Description
Project consists of widening the existing Hwy 395 from one lane to two lanes in each direction. The proposed project will also provide a two-way-left-turn-lane, and standardize shoulders. The existing alignment will be widened approx. 2.68 meters (m) in each direction to accommodate 3.6m lanes, a 2.4m shoulder in each direction, and a 4.2m two-way-left-turn lane in the median. The existing Joshua Wash Bridge (BR No. 54-0524) will be replaced to accommodate the proposed roadway improvements. The bridge will replace the existing double cox culvert (10ftx4ft) and extend the bridge. The construction buffer for the bridgework allows a 50ft. perimeter around the bridge to allow machinery access for removing and replacing the structure. The existing culverts will be modified or relocated to accommodate the new lanes. There are 17 drainage systems that will require modification. All drainages on this project are roadside features and are no connected to any streams or ditches.

Contact Information

Name
Heather Elder
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Adelanto, Hesperia, Victorville
Counties
San Bernardino
Cross Streets
I-15 and Desert Flower Rd
Zip
various
Parcel #
various
State Highways
I-15
Airports
Sunhill Ranch
Schools
various
Waterways
California Aqueduct
Township
4,6N
Range
4,6W
Section
5,26

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.