Highway 395 Widening Phase 1 (0F631) (Lake or Streambed Alteration Agreement No. 1600-2016-0106-R6)

4 Documents in Project

Summary

SCH Number
2009081105
Lead Agency
Caltrans 8 (San Bernardino) (California Department of Transportation, District 8)
Document Title
Highway 395 Widening Phase 1 (0F631) (Lake or Streambed Alteration Agreement No. 1600-2016-0106-R6)
Document Type
NOD - Notice of Determination
Received

Document Description
Project consists of widening the existing Hwy 395 from one lane to two lanes in each direction. The proposed project will also provide a two-way-left-turn-lane, and standardize shoulders. The existing alignment will be widened approx. 2.68 meters (m) in each direction to accommodate 3.6m lanes, a 2.4m shoulder in each direction, and a 4.2m two-way-left-turn lane in the median. The existing Joshua Wash Bridge (BR No. 54-0524) will be replaced to accommodate the proposed roadway improvements. The bridge will replace the existing double cox culvert (10ftx4ft) and extend the bridge. The construction buffer for the bridgework allows a 50ft. perimeter around the bridge to allow machinery access for removing and replacing the structure. The existing culverts will be modified or relocated to accommodate the new lanes. There are 17 drainage systems that will require modification. All drainages on this project are roadside features and are no connected to any streams or ditches.

Contact Information
Heather Elder
CDFW
3602 Inland Empire Blvd., suite C-220
Ontario, CA 91764

909-980-8607

Location

Coordinates
34°23'59.92"N 117°24'6.27"W
Cities
Victorville Hesperia Adelanto
Counties
San Bernardino
Cross Streets
I-15 and Desert Flower Rd
Zip
various
Parcel #
various
State Highways
I-15
Airports
Sunhill Ranch
Schools
various
Waterways
California Aqueduct
Township
4,6N
Range
4,6W
Section
5,26

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3602 Inland Empire Blvd., Suite C-220, Ontario, CA 91764

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search