Tavelman Minor Subdivision; 3200 20920 (TPM)

2 Documents in Project

Summary

SCH Number
2009081101
Lead Agency
San Diego County
Document Title
Tavelman Minor Subdivision; 3200 20920 (TPM)
Document Type
NOD - Notice of Determination
Received
Posted
11/23/2009
Document Description
The proposed project is a minor residential subdivision within the Alpine Community Planning Area. The project proposes to divide 5.82 net acres into 4 parcels measuring 2.55 acres (1.77 net), 1.35 acres (1.08 net), 1.02 acres (1.00 net) and 2.00 acres (1.80 net). An existing single-family residence is located on the proposed parcel 1. The project is subject ot the Regional Land Use Element 1.55 (CRDA) County Residential Development Area and General Plan Use Designation (1) Residential, which permits 1, 2 or 4 dwelling units per gross acre, depending on the slope of the proposed parcels. The current zone for the property is Limited Agriculture, which requires a minimum lot size of the proposed for septic. The project will be served by the following agencies/district: Padre Dam Municipal Water District, Alpine Fire Protection District, Grossmont Union High School District, and Alpine Union School District.

Contact Information

Name
Kristina Jeffers
Agency Name
San Diego County
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
East Victoria Dr/Overland Passage
Zip
91901
Total Acres
6.61
Parcel #
404-012-31-00
State Highways
I-8
Township
15S
Range
2E
Section
26
Base
SBB&M
Other Location Info
City/Nearest Community: Alpine

Notice of Determination

Approving Agency
San Diego County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print