Goodrow Conditional Use Permit
5 Documents in Project
Summary
SCH Number
2009081096
Lead Agency
San Luis Obispo County
Document Title
Goodrow Conditional Use Permit
Document Type
NOD - Notice of Determination
Received
Posted
8/23/2010
Document Description
Request by Brad Goodrow for a Conditional Use Permit for a green waste comprising facility including: Approval of an existing 5.86 acre compost research facility as a permanent facility, including the grinding and processing of green waste into finished compost material; A 2.17 acre expansion of the facility (for a total of 8.03 acres, including the addition of vegetable food waste composting; A 4,000 sf gypsum processing building; A 3,000 sf pole barn to store equipment out of the elements; An ~960 sf shed to house biodiesel mixing equipment; and An expansion of the current composting volume capacity from 12,500 tons to a maximum 50,000 tons, as permitted by the California Intergrated Waste Management Board.
The project would result in ~9 acres of disturbance and ~39,000 cy of cut and 39,000 cy of fill on a 440 acre parcel. No land use permits were obtained to initiate the existing 5.86 acre composting facility. As listed above, a portion of the proposed project would be to legalize the existing, as-built portion of the facility as a conditionally allowable use on the Agriculture designated parcel. The proposed project is within the Agriculture land use category and is located at 3730 Calf Canyon Road (hwy 58), ~0.5 miles east of O'Donovan Road, southeast of the community of Creston.
Contact Information
Name
Jeff Oliveira
Agency Name
San Luis Obispo County Dept of Planning & Building
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Luis Obispo
Cross Streets
Calf Canyon Rd
Zip
93432
Total Acres
440
Parcel #
043-323-008, 009
State Highways
Hwy 58
Other Location Info
City/Nearest Community: Village of Creston
Notice of Determination
Approving Agency
San Luis Obispo County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.