Pier B Railyard

9 Documents in Project

Summary

SCH Number
2009081079
Lead Agency
Port of Long Beach
Document Title
Pier B Railyard
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2024
Document Description
The proposed Project is designed to improve rail operations to accommodate on-dock rail cargo; maximize on-dock intermodal operations; provide a facility that can accept and handle longer container trains. The proposed Project would provide more efficient rail operations, both within and to/from the San Pedro Bay Ports complex; address physical deficiencies of the existing Pier B Rail Yard with respect to supporting on-dock rail operations; and improve local roadways, utilities, and infrastructure.

Contact Information

Name
Sarah Workman
Agency Name
Port of Los Angeles
Job Title
Environmental Specialist III
Contact Types
Responsible Agency

Location

Cities
Carson, Long Beach, Los Angeles, San Pedro
Counties
Los Angeles
Regions
Citywide, Countywide, Nationwide, Southern California, Statewide
Cross Streets
Pier B

Notice of Determination

Approving Agency
Port of Los Angeles Harbor Department
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.portoflosangeles.org/environment/environmental-documents

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Findings of Fact, Statement of Overriding Considerations, Mitigation Monitoring and Reporting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print