Final Environmental Impact Report for the Pier B On-Dock Rail SUpport Facility Project; Harbor Development Permit No. 07-021

5 Documents in Project

Summary

SCH Number
2009081079
Lead Agency
Long Beach, Port of (Port of Long Beach)
Document Title
Final Environmental Impact Report for the Pier B On-Dock Rail SUpport Facility Project; Harbor Development Permit No. 07-021
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2018
Present Land Use
Rail and Industrial/IP Zone: Port related industrial uses/land use district no. 12: harbor/airport district

Document Description
Project would reconfigure, expand, and enhance the existing rail support facility located at Pier B in the Port of Long Beach to provide for additional railcar storage and staging capacity, including 36 additional rail tracks for railcar repair, and fueling, and to accommodate for assembly of cargo trains up to 10,000 feet long. The project would require realignment of Pier B Street, closure of the existing 9th Street grade crossing and certain local streets, and removal of existing ramps to and from the Shoemaker Bridge to provide sufficient area for expansion of the on-dock rail support facility. Utility lines would be newly constructed or relocated into subsurface utility corridors located between tracks.

Contact Information
Allyson Teramoto
Port of Long Beach
4801 Airport Plaza Dr
Long Beach, CA 90815-1263

Phone : (562) 283-7100

Location

Coordinates
33°46'"N 118°46'"W
Cities
Long Beach
Counties
Los Angeles
Cross Streets
Pico Ave & I-710
Zip
90802
State Highways
I-710, SR 47
Railways
Alameda Corridor
Waterways
Los Angeles River, Pacific Ocean

Notice of Determination

Approving Agency
City of Long Beach
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
4801 Airport Plaza Dr., Long Beach, CA 90815

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search