Pier B On-Dock Rail Support Facility Project; Harbor Development Permit No. 07-021
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009081079
- Lead Agency
- Port of Long Beach
- Document Title
- Pier B On-Dock Rail Support Facility Project; Harbor Development Permit No. 07-021
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/1/2018
- Present Land Use
- Rail and Industrial/IP Zone: Port related industrial uses/land use district no. 12: harbor/airport district
- Document Description
- Project would reconfigure, expand, and enhance the existing rail support facility located at Pier B in the Port of Long Beach. The Project would result in additional railcar storage and staging capacity, including 36 additional rail tracks for locomotive refueling, railcar repair, and to accommodate the assembly of cargo trains up to 10,000 feet long. Project would require realignment of Pier B St., closure of an existing grade crossing at 9th Street, and additional realignments and closures of number of local streets to provide a sufficient area for expansion of the rail yard. Utility lines would be newly constructed or relocated into subsurface utility corridors located between tracks. The full build-out of the Project would require removal of existing ramps to and from the Shoemaker Bridge.
- Contact Information
-
Allyson Teramoto
Port of Long Beach
Lead/Public Agency
4801 Airport Plaza Dr
Long Beach, CA 90815-1263
Phone : (562) 283-7100
Location
- Coordinates
- 33°46'"N 118°46'"W
- Cities
- Long Beach
- Counties
- Los Angeles
- Cross Streets
- Pico Ave & I-710
- Zip
- 90802
- State Highways
- I-710, SR 47
- Railways
- Alameda Corridor
- Waterways
- Los Angeles River, Pacific Ocean
Notice of Determination
- Approving Agency
- City of Long Beach
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 4801 Aiport PlazaDr., Long Beach, CA 90815
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.