Midpines Bible Church, Stream Alteration Agreement NO. 2008-0204-R4

3 Documents in Project

Summary

SCH Number
2009081055
Lead Agency
Mariposa County
Document Title
Midpines Bible Church, Stream Alteration Agreement NO. 2008-0204-R4
Document Type
NOD - Notice of Determination
Received
Posted
12/7/2009
Document Description
A 30 ft length by 48 inch wide culvert will be installed in the channel of the seasonal drainage for the length of the property to accommodate the construction of a new parking lot for the church. Approximately 1,350 cy of native material will be used for fill over the culvert for the construction of the parking lot. A concrete headwall will be constructed at the upstream end of the culvert. An outlet protection/velocity dissipation device (concrete and rip rap apron) will be constructed at the downstream end of the culvert. Approximately 1,500 lbs. of angular rip rap will be keyed in to the ground at the outlet. The Project area consists of the area within or adjacent to an unnamed drainage, with associated foothill blue-oak woodland and non-native annual grassland.

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Mariposa
Cross Streets
Hwy 140/Carstens Rd.
Zip
95345
Total Acres
7.75
Parcel #
009-170-024
State Highways
140
Waterways
Bear, Plumbar Creeks
Township
4S
Range
19E
Section
31
Base
MDB&M
Other Location Info
City/Nearest Community: Midpines

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print