UCSD East Campus Bed Tower Project

3 Documents in Project

Summary

SCH Number
2009081053
Lead Agency
University of California San Diego
Document Title
UCSD East Campus Bed Tower Project
Document Type
NOD - Notice of Determination
Received
Posted
7/15/2010
Present Land Use
PLU: UCSD East Campus GP: Medical Use per the 2004 Long Range Development Plan
Document Description
The proposed project is a hospital expansion on the west side of the existing Thornton Hospital on the UC San Diego east campus in La Jolla. The proposed project is a 10-story approximately 470,310 square foot hospital bed tower with capacity for 245 inpatient beds and a helicopter pad on top of the bed tower. The proposed project will also renovate 63,800 square feet of existing space in Thornton Hospital and construct a 35,900 square foot stand-along central utility plant to serve the hospital complex.

Contact Information

Name
Catherine Presmyk
Agency Name
University of California San Diego
Contact Types
Lead/Public Agency

Location

Cities
La Jolla
Counties
San Diego
Cross Streets
Campus Point Drive/Medical Center Drive
Zip
92093
Total Acres
10
State Highways
I-5
Railways
NCTP Coaster, Amtrack
Airports
MCAS Miramar
Schools
La Jolla Country Day
Waterways
Rose Creek
Township
15S
Range
3W
Base
LaJolla

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print