Meathead Movers Office and Self Storage Facility: 2009-0063-R4

Summary

SCH Number
2009079007
Lead Agency
City of San Luis Obispo
Document Title
Meathead Movers Office and Self Storage Facility: 2009-0063-R4
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2009
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant, Mr. Steve Saldo. The proposed project would consist of building a detention basin along the east bank of San Luis Obispo Creek. The basin would be approximately 4' deep at its greatest depth and have a maximum capacity of 13,405 cubic feet of water. The basin would be constructed on an upland area outside of the top bank. Drain pipes measuring approximately 4 and 12" in diameter would carry flow to a rock slope protection (RSP) energy dissipater pad installed on the upper banks of San Luis Obispo Creek. The RSP pad would be trapezoidal in shape, measuring approximately 15' long, 11' wide at its uphill end, and 20' wide at the downhill end, and would consist of 12 and 18" diameter RSP. A concrete retaining wall would be constructed at the uphill end of the dissipater. During periods of runoff, water would settle into the detention basin and sediment allowed to settle. If water levels reach the outlet pipes, it would be carried to the RSP dissipater and then flow down the bank into San Luis Obispo Creek.

Contact Information

Name
Mike Hill
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.