Cogeneration Plant Expansion Project

Summary

SCH Number
2009078126
Public Agency
University of California San Diego
Document Title
Cogeneration Plant Expansion Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/20/2009
Document Description
The proposed project would expand cogeneration capabilities at the existing CUP. The existing plant produces 30 Mw of power. The expansion would add 15.25 additional MW or power for a new total of 45.25 MW of power. The proposed project includes approximately 5,000 gross-square-feet (gsf) of new building construction as follows: 1) an addition to the existing cogeneration plant of approximately 3,800 gsf to house a new combustion turbine generator and the waste heat recovery steam generation; 2) a second-story building expansion of the existing electrical room of approximately 1,200 gsf; and 3) associated utility connection along Voigt Drive to distribute the additional power to North Campus.

Contact Information

Name
Catherine Presmyk
Agency Name
University of California San Diego
Contact Types
Lead/Public Agency

Location

Cities
La Jolla
Counties
San Diego

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Sec 15329
Reasons for Exemption
Installation of the proposed cogeneration plant expansion would result in no net increase in air emissions from the institutional facility, complies with all applicable state, federal and local air quality laws, results in no noticeable increase in noise to nearby residential structures, and is contiguous to other institutional structures.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print