Permit No. 19534: Mendota Pool Bypass: Mowry Bridge Pump Relocation
9 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2009072044
- Lead Agency
- California State Lands Commission (SLC)
- Document Title
- Permit No. 19534: Mendota Pool Bypass: Mowry Bridge Pump Relocation
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/21/2021
- Document Description
- Approval of Permit No. 19534, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To relocate an existing pump, platform, and 12-inch diameter discharge pipe on the left (east) bank of the Fresno Slough. The drainage system will be relocated from north of the Mowry Bridge to approximately 120 feet south of the bridge. The permit also authorizes the existing drainage system constructed in 1950.
- Contact Information
-
Itzia Rivera
Central Valley Flood Protection Board
Lead/Public Agency
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821
Phone : (916) 480-5388
itzia.rivera@cvflood.ca.gov -
BB Limited
Project Applicant
Location
- Cities
- Mendota
- Counties
- Fresno
- Other Location Info
- The project is located about 0.2 miles east of Bass Avenue and approximately 1.3 miles northeast of the City of Mendota in Fresno County.
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- This Environmental Impact Report, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. CVFPB’s administrative record of proceedings related to the encroachment permit is available for public review at CVFPB’s office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 19534 - NOD PDF 137 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.