Tuolumne Utilities District
3 Documents in Project
Summary
SCH Number
2009072022
Lead Agency
Tuolumne Utilities District
Document Title
Tuolumne Utilities District
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2009
Document Description
1) Transfer an existing Cedar Ridge Apple Ranch, LLC well located on APN 85-350-020/033 (14677 Summers Lane) to the Tuolumne Utilities District as credit towards using TUD-treated water at the existing apple processing facility located on APN 85-350-030 (14685 Summers Lane/ 14679 Summers Lane).
2) Extend an existing TUD waterline from its terminus at the Apple Court cul-de-sac and northerly along an existing dirt road (threough the vacant APN 85-360-43) then easterly for a short distance following Summers Lane through 85-350-20 (14677 Summers Lane) and to the existing apple packing shed at 14685/14679 Summers Lane (85-350-30) ~3,400 ft. The 10" waterline will use the existing bridge on Summers Lane to cross Power Creek/Power House Ditch.
The waterline will be used for apple processing, to expand apple-processing operations and may be used in the future for limited housing for agricultural workers. The potential impacts associated with potential future farmworker housing is not included in the current proposal and is subject to additional permitting and analysis by Tuolumne County.
Contact Information
Name
Kelly Klyn
Agency Name
Tuolumne Utilities District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sonora
Counties
Tuolumne
Cross Streets
Lyon's Bal Mountain Rd, Summer's Lane
Zip
95370
Total Acres
6 +/-
Parcel #
85-350-20/30/33, 85-360-43
Waterways
Phoenix Lake/Sullivan Creek/Powerhouse Ck/Ditch
Township
2N
Range
15E
Section
21,22,
Base
MDB&M
Other Information
Section: 27
Notice of Determination
Approving Agency
Tuolumne Utilities District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.