Trinity River Farm Use Permit

2 Documents in Project

Summary

SCH Number
2009072005
Lead Agency
Humboldt County
Document Title
Trinity River Farm Use Permit
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2009
Document Description
A Conditional Use Permit for seasonal special events, camping use and cabins. The applicant proposes a maximum of 12 events per year held May to September with a maximum of 300 guests attending. Events will be held on the weekends between 10 AM and 11 PM. No more than one event per weekend is proposed. As a second phase of the project, 5 new tent camping spaces along with the construction of 4 rental cabins are proposed. These will be in use May through September. Parking area and bathroom facilities are provided. The ~20 acre parcel is currently used as an agricultural operation. Improvements include a vegetable stand, barn and green houses. No trees are proposed to be removed and minimal grading is required. The parcel is served by on site septic and community water. A Special Permit is required to establish parking standards for the event use.

Contact Information

Name
Beth Burks
Agency Name
Humboldt County
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
SR 96
Zip
95573
Total Acres
20
Parcel #
522-114-23
State Highways
96
Waterways
Trinity River
Township
1N
Range
5E
Section
17
Base
HB&M
Other Location Info
City/Nearest Community: Willow Creek

Notice of Determination

Approving Agency
Humboldt County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print