Suisun Valley Roadbridge 23C0077 at Suisun Creek, bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2009072004
Lead Agency
Solano County
Document Title
Suisun Valley Roadbridge 23C0077 at Suisun Creek, bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/26/2011
Document Description
The project is located on Suisun Valley Road, 4.7 miles northwest of the City of Fairfield, Solano County. The project includes replacing a 16-foot wide and 88-foot long single-lane bridge with a two-lane 43-foot side and 89-foot long bridge on Suisun Creek. A temporary bridge will be installed to maintain traffic during construction. Other work includes extending a 30-inch diameter culvert and replacing an undersized 30-inch diameter culvert n two tributaries to Suisun Creek. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2011-0141-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Robert Liu, Solano County Resource management.

Contact Information

Name
Brenda Blinn
Agency Name
DFG, Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Fairfield
Counties
Solano
Cross Streets
Twin Sisters Rd
Zip
94585
Total Acres
APE 2.28
Parcel #
county road
State Highways
No
Railways
No
Airports
No
Schools
Suisun Valley
Waterways
Suisun Creek
Township
5N
Range
2W
Section
7
Base
MDB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print