Ramona High School Football Stadium Renovation

2 Documents in Project

Summary

SCH Number
2009071120
Lead Agency
Riverside Unified School District
Document Title
Ramona High School Football Stadium Renovation
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2009
Present Land Use
Z: Public Facilities GP: Public Facilities/Instituional
Document Description
The project would involve the removal of the existing track and field, visitors bleachers, and stadium field lighting. New home bleachers with 2,500 seats would be built, increasing the stadium capacity from 4,200 to 5,500 seats. A new track and field with artificial turf would be installed. Two new buildings totaling about 6,000 sf would be built, plus a paved parking lot with 124 spaces, as well as new field lighting. The existing ball fields would also be modernized.

Contact Information

Name
Janet Dixon
Agency Name
Riverside Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Cross Streets
Magnolia Ave and Jefferson St
Zip
92504
Total Acres
21
Parcel #
237-230-002
State Highways
91
Railways
BNSF/Metrolink, UPRR
Airports
Riverside Municipal
Schools
Several
Waterways
Riverside Canal, Meto Water District Aqueduct
Township
3S
Range
5W
Section
4

Notice of Determination

Approving Agency
Riverside Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print