Streambed Alteration Agreement No. 2007-0180-R4 for the Conditional Use Permit No. 2008-106 (Sweetwater Youth Camp)

3 Documents in Project

Summary

SCH Number
2009071119
Lead Agency
Mariposa County
Document Title
Streambed Alteration Agreement No. 2007-0180-R4 for the Conditional Use Permit No. 2008-106 (Sweetwater Youth Camp)
Document Type
NOD - Notice of Determination
Received
Posted
4/8/2010
Document Description
The Sweetwater Christian Youth Camp proposes to expand an existing recreational reservoir with an island, beaches, docks, a dam, and a spillway. The reservoir will affect the flow in Sweetwater Creek during high water events when the spillway will allow overflow to enter the creek headwaters. The pond surface area will be increased from 10,414 sf to 31,600 sf. The volume will increase from 1,504 cy to 4,461 cy. The dam will be constructed of on-site and imported fill totaling ~3,500 cy and will be ~345 ft long. The spillway will be an Agri Drain Inlet Water Level Control Structure. The water elevation will remain the same before and after construction. The Project area consists of the area within or adjacent to the pond and overflow to Sweetwater Creek, and associated mixed conifer and oak woodland and riparian habitats.

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Mariposa
Cross Streets
Jerseydale Rd/Forest Rd 5S24
Zip
95338
Total Acres
95.68
Parcel #
009-050-008
Waterways
Bear, Sweetwater, Plumbar, Snow, Jones Creeks
Township
4S
Range
19E
Section
20,21
Base
MDB&M
Other Location Info
City/Nearest Community: Mariposa

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes