Imperial Beach Public Works Yard Expansion

2 Documents in Project

Summary

SCH Number
2009071093
Lead Agency
City of Imperial Beach
Document Title
Imperial Beach Public Works Yard Expansion
Document Type
NOD - Notice of Determination
Received
Posted
9/8/2009
Document Description
This is an application for Design Review (DRC 080009), Site Plan Review (SPR 080010), and California Coastal Development Permit (CDP 6-09-030) for the expansion of the Public Works yard on a 2.86 acre parcel at 495 10th Street in the Public Facility Zone. This expansion is proposed dut eto the expansion of the programs and staff at the Public Works Department. This project is also proposed to clean up the visual blight of the industrial activity that is occurring on the west side of the existing parking lot. The trash ramp, trash bins and waste storage adjacent to the bikeway are proposed to be relocated to the railroad track area on the south so that those on the Bayshore Bikeway are not exposed to unpleasant views along the City perimeter.

Contact Information

Name
Larry Martin
Agency Name
City of Imperial Beach Community Development Department
Contact Types
Lead/Public Agency

Location

Cities
Imperial Beach
Counties
San Diego
Cross Streets
10th St and Cherry Ave
Zip
91932
Total Acres
2.86
Parcel #
626-060-01, 02, 05; 626-050-02
State Highways
75
Railways
MTS
Airports
Naval Outlying Land Field IB
Schools
Bayside ES
Waterways
San Diego Bay
Township
18S
Range
2W
Section
20
Base
SBB&M

Notice of Determination

Approving Agency
Imperial Beach City
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print