Approval and adoption of an Addendum prepared for a site plan in the Meridian Business center for a 600,000 square foot distribution center on 26.95 acres

20 Documents in Project

Summary

SCH Number
2009071069
Lead Agency
March Joint Powers Authority
Document Title
Approval and adoption of an Addendum prepared for a site plan in the Meridian Business center for a 600,000 square foot distribution center on 26.95 acres
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2011
Document Description
The Project includes Zoning 11-01 for the redistribution of allowable building square footage within the Accident Potential Zones located northeast of March Air Reserve Base/March Inland Port airport in the March Business center (Meridian). The project would redistribute a total of 32,055 square feet of building area within the Accident Potential Zones. The reallocation comes entirely from Lot 68 (unit 1-SP-1), located north of Cactus Avenue along the I-215 Freeway, to one lot located approximately 3,500 feet to the south of Cactus Avenue (unit 1-Lots 5 & 60SP-5). The Project includes Variance 11-01 to permit a 5'-6" height encroachment as the proposed warehouse distribution facility exceeds the height requirements set forth in the Development Regulations of the Meridian Specific Plan Amendment (SP-5). The maximum height of a building in the Industrial zoning district is 35' feet. An increased height up to 80' feet is permitted where all building setbacks meet or exceed the proposed building height. The proposed building has a setback of 40'-6", and has varied wall planes and parapet height variations ranging from 42' to 48' feet tall. The parapet encroachments 5'-6' into the maximum building height plane at its highest point.

Contact Information

Name
Adam Collier
Agency Name
March Joint Powers Authority
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley, Perris, Riverside
Counties
Riverside
Cross Streets
Van Buren Blvd/I-215
Zip
92518
Total Acres
957.7
Parcel #
Numerous
State Highways
I-215
Railways
BNSF
Airports
March ARB/Inland Port
Schools
Tomas Rivera Elementary
Township
5S
Range
4W
Section
Numer
Base
SBB&M

Notice of Determination

Approving Agency
March Joint Powers Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print