Stream Alteration Agreement No. 2009-0099-R4 for the Gill Ranch Storage Project at teh San Joaquin River, Fresno Slough, Fresno (Kings) Slough Overflow Features

10 Documents in Project

Summary

SCH Number
2009071057
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Stream Alteration Agreement No. 2009-0099-R4 for the Gill Ranch Storage Project at teh San Joaquin River, Fresno Slough, Fresno (Kings) Slough Overflow Features
Document Type
NOD - Notice of Determination
Received
Posted
5/5/2010
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the Gill Ranch Storage Pipeline Project. The Gill Ranch Gas Storage Project consists of a 5,020-acre surface area (Storage Field), within which a total of approximately 20 acres will be developed with surface facilities including a 10-acre central compressor station, gas injected, withdrawal wells, fields gathering lines, and observation wells. The Project also includes a 26.7-mile 30 inch diameter gas transmission pipeline, and 9.3-mile electric power line. For the purpose of this Agreement, there are five (5) locations where the 30-inch gas pipeline crosses water features that the Department has determined are subject to regulation pursuant to Fish and Game Code Section 1600 et seq. These locations are: -Fresno (Kings) Slough Overflow "Feature 16" -Fresno (Kings) Slough Overflow "Feature 16A" -Fresno Slough "Feature 17" -San Joaquin River and -Lone Willow Slough-Chowchilla Canal Bypass

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Mendota
Counties
Fresno, Madera
Cross Streets
SR 180/Whitesbridge Ave and NorthSan Mateo Ave
Zip
93640
Total Acres
36
State Highways
SR 33, SR 180
Railways
UPRR
Airports
Mendota
Schools
Mendota HS
Township
14S
Range
15E
Section
10
Base
MDB&M

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print