22140, 22144 and 21466 Pacific Coast Highway Initial Study

2 Documents in Project

Summary

SCH Number
2009071052
Lead Agency
City of Malibu
Document Title
22140, 22144 and 21466 Pacific Coast Highway Initial Study
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2010
Document Description
Coastal Development Permit No. 08-090, Lot Merger No. 08-004, Stringline Modification Request No. 08-003, Demolition Permit No. 08-028, Offer to Dedicate No. 09-011, Initial Study No. 09-004 and Negative Declaration No. 09-004 - An application for the demolition of three adjacent single family residences totaling 6,591 sf, the merger of the three contiguous properties, construction of a new 28 ft high, 8,156 sf, single family residence, consisting of 445 sf a below grade mechanical / storage vault, 4,096 sf of living space and a 441 sf garage on the ground level, and 3,174 sf of living space on the second floor, covered porches and decks, a 60 ft, 10 inch by 15 ft swimming pool and spa, a new alternative onsite wastewater treatment system, grading, landscaping, a 24 ft wide view corridor adjacent to the eastern property line and an offer to dedicate lateral public access along the sand over the width of the merged parcel.

Contact Information

Name
Stephanie Danner
Agency Name
City of Malibu
Contact Types
Lead/Public Agency

Location

Cities
Malibu
Counties
Los Angeles
Cross Streets
Pacific Coast Highway and Carbon Canyon Road
Zip
90265
Total Acres
0.47
Parcel #
4451-006-028, 029, 030
State Highways
1
Schools
Cardon Malibu School, 3504 Las Flores Canyon
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Malibu
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print