Berths 302-306 APL Container Terminal Project

7 Documents in Project

Summary

SCH Number
2009071031
Lead Agency
City of Los Angeles
Document Title
Berths 302-306 APL Container Terminal Project
Document Type
NOD - Notice of Determination
Received
Posted
10/28/2016
Present Land Use
Zoned Heavy Industrial
Document Description
The proposed Project is located on Terminal Island within the Port of Los Angeles. The proposed Project site encompasses Berths 302-306 and is bounded by Terminal Way and Seaside Avenue to the north, Navy Way to the east, Earle Street to the west and Pier 300 and the Outer Los Angeles Harbor to the south. The approved Project involved the expansion of the terminal by adding Berth 306, adding 41 acres of constructed but unimproved back land and the installation of 12 cranes. Terminal capacity would expand to 3.2 million Twenty-foot Equivalent Units (TEUs) upon build out. The revised Project is now a smaller scope that would extend the lease an additional 16 years through 2043, replace eight existing cranes and reduce the previously assess throughput capacity to 2.4 million TEUs.

Contact Information

Name
Tara Tisopulos
Agency Name
Los Angeles Harbor Department
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Terminal Island near Ferry Street
Zip
90731
Total Acres
347
State Highways
SR-47; I-110
Railways
on-dock rail
Airports
No
Schools
Port of LA HS
Waterways
Los Angeles Harbor (Fish Harbor/Pier 300 Channel)
Other Location Info
City/Nearest Community: San Pedro

Notice of Determination

Approving Agency
Los Angeles Harbor Dept.
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print