Rush Meadows Dam Geomembrane Installation Project

Summary

SCH Number
2009068399
Public Agency
State Water Resources Control Board
Document Title
Rush Meadows Dam Geomembrane Installation Project
Document Type
NOE - Notice of Exemption
Received
Posted
6/30/2009
Document Description
Rush Meadows Dam is a 50 foot high concrete arch dam that is operated as part of the SCE hydroelectric power generation system under Federal Energy Regulatory Commission, Project No. 1389. This dam impounds Rush Creek and maintains minimum instream flows that replenish Gem Lake, which is the forebay to the penstock and powerhouse. Increased leakage from Rush Meadows Dam compromises its holding capacity. SCE proposes to seal leaks by installing a geomembrane liner and to conduct repairs, which will extend the operating life of the dam.

Contact Information

Name
Whalen Toy
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
Mono

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15304 - Class 1, 4
Reasons for Exemption
SCE proposes to repair the deteriorated surface areas of Rush Meadows Dam due to years of exposure to the elements.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print