Greenhorn Creek CSD Water System Refurbishment

2 Documents in Project

Summary

SCH Number
2009068199
Public Agency
Greenhorn Creek Community Services District
Document Title
Greenhorn Creek CSD Water System Refurbishment
Document Type
NOE - Notice of Exemption
Received
Posted
8/18/2009
Document Description
CA Department of Public Health is submitting the NOE as Responsible Agency. This project consists of 1- For the community wells :(a) replacing above ground piping inside the well houses; (b) replace well-head water meters; (c) replace chlorination system with modern chlorinators; (d) add backflow preventers to meet current drinking water standards; 2- Pressure reducing valves and air vacs - replace existing pressure reducing valves at two pressure reducing stations and add air vacuum release valves; 3 - control systems - replace control systems and 24VAC control wiring throughout system with modern SCADA controls.

Contact Information

Name
Leah Walker
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Quincy
Counties
Plumas

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302 - Class 2
Reasons for Exemption
Repair, replacement, and minor alteration of existing community water systems.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print